1.Good service
2.High quality
No
Item
1
Burning system/heat preservation system
1set, 8high speed muzzles, 8 air/gas proportional valve, flam lighter, air valve ,high voltage lighter, hot-air blower, gas valve, solenoid pilot actuated valve ,wind pipe, gas pipe, pressure instrument, flame probe.
2
Gas voltage regulation system Pressure regulating valve, filter, pressure switch
3
Temperature detector system:
Six sets temperature detector system
4
Drive system:
3set, stainless steel blower, 55/67kw motor, v type belt and actuator.
5
Bottom:
Steel rail 30kg/m light rail , bottom refractory material, light-weight insulating brick and heat preservation cotton thickness is 300mm.
6
Flue: Flue and chimney, exhaust transformer control cabinet and control cable.
7
Electrical control circuit
380Vmotor control, 3set 55/67kw transformer,1set 37kw motor starter,1set 3kw crane engine control unit,1 control inverter 380V/220V transformer.
220VControl: 8 muzzle program, temperature control, temperature recording instrument, 10.4”touch display
These components assemble with a control system as a whole, mating buttons, indicators, switches, alarm, reset, and so on
8
30T(air)cooling system
3 sets Exhaust fan 22kw, hand valve, furnace steel structure and exhaust path, door and lift system, foundation drawing and control cabinet.
Other
1
Not marked components in accordance with standard the and design .
2
Dry and preheating system: Preheat system is by the seller, the produce a schedule to the buyer.
3
The seller is responsible for installation and adjustment
4
The seller is responsible for the operation of the process and maintainer training
Note
1) The seller to provide technical details, to know the equipment and components is consistent with our request
2) Battery Limit -As specified
3)To submit to the control components of workshop.
4) Effects request, the seller is responsible for the quality.
5) The seller shows that any of the PLC earth point and the value of Ohmic.
6) Sellers need to include the basis of the bolts. Sellers need to complete the foundation and load data.
7Sellers are requested to indicate the workshop supply outside the scope of equipment and materials in order to the division of labor in the future and the safe operation.