Thursday, April 21, 2011

Aluminium Scrap Melting Induction Furnace

CE and ISO9001:2000
Good quality and resonable price
Short dilivery time
Power saving
can melt iron, steel, zinc, lead,etc
Yiphee Electric Crucible Furnace passed ISO international quality system certification and EU CE Certification,and have been sold to many contries,such as Europe, Belarus, Russia, Kosovo, Portugal, Africa, Libya, Zambia, Zimbabwe, South America, Ecuador, Peru, Brazil, North America, Asia, Hong Kong, Vietnam, Malaysia, Indonesia, Myanmar, Saudi Arabia, Lebanon, Bahrain, Tajikistan, Uzbekistan, North Korea, Poland, Iran, Australia, Colombia, etc.
Welcome to visit us!

Structure Feature
1. Aluminium sheel tilting induction furnace;
2. Good magnetic isolation, safe and reliable;
3. Solid frequency conversion power supply, easy operation;
4.Adjustable power rate, easy operation and maintenance;
5. Easy to start up with load or free of load.

Equipment
advantage

a.
With auto breaker (DW15 type)—own protection performance
Quick power disconnect protection for unusual circuit, such as short circuit, break circuit, phase missing, power failure, low voltage, discharge, protect power system and equipment.
b.
Our equipment has 14 thyristors, which could withstand high output voltage. The higher voltage output, the higher efficiency the equipment perform. The working voltage of the products from other factory is between 750v-800v, ours is higher than 1000v. Under the same power output, our product can heat more quickly and consume less power;
c.
Obtain Inner pure water circulation cooling system;
Such cooling system will not form incrustation scale to stop the production. Other suppliers’ furnace just uses running water or groundwater for cooling, the incrustation scale are easily to block the circulation and stop the equipment. We just need little pure water to keep the equipment work properly;
d.

All tightening bolt are make of stainless steel rather than iron or brass bolt from other supplier. Stainless steel bolts are strong, magnetism conduct, free from rusting and looks shinning;
e.
Full load testing
We conduct full load testing before delivery, so we just teach user how to use. Many other factories don’t have high power supply, they can only test with low power and solve the problem at user’s place, which will delay the test.
f.

We install the elements on Bakelite board rather than Leftover board which will cause electric leakage;
g.
Adopt convenient water connector, which make a quick convenient installation;
h.

Adopt stainless steel water distribution rather than galvanize iron pipe which are easily rusting;
i.

Adopt resistance without induction rather than wind making resistance for absorption resistance;
j.
Adopt double insulation high voltage cable with over 800v working voltage. The other factory use common cable which can easily be penetrated over 500v;
k.
Employ world advanced invariableness power auto- controlled circuit;
l.
Use zero voltage initiating, no impact to power supply. 100% successfully initiate.
m.
Malfunction rate 90% lower, 20-30% power consumption lower than old style IF equipment.
n.
Most of our engineers have 20 years manufacturing experience, and some of them have many experiences of working in foreign countries.

Term of payment:
30% payment by T/T&L/C after sign the contract, 70% payment by T/T&L/C upon Fax(or email) the copy of lading bill.

Delivery date:

15days after receive the T/T or L/C payment.
Installation, testing and training
a. The seller is responsible for the installation instruction, testing and training after the buyer complete cement basement according to seller’s drawing
b. The buyer should afford the air ticket, accommodation, board, and other relevant fees to the seller’s technician.
c. Generally, the installation period is 5-7days. The seller is responsible for the salary exceed this period.
After sales service
The seller provide guarantee free for 1 year from the date of shipment.
The seller is not responsible for the problem caused by wrong operation, and working environment couldn’t meet the working condition.
The seller will give technical instruction when the buyer need

No comments:

Post a Comment